Our Knowledge Base contains the answers to more than 500 previously asked questions.
-
Bid Manager
- ☞Video: Bid Manager
- How do we create a bid package from an Estimate?
- How do I send a request to bid to bidders?
- If a bidder needs to rebid, what do I need to do?
- How do I record bid numbers that were given to us offline?
- Do I have to create an estimate before creating a bid package?
- Does my sub have to create an account before they can submit their bid?
- How do I review the bids that have been received?
-
Bills
- Video: Bills
- Are Bills synced with QuickBooks?
- Can a customer or vendor credit be added?
- How do I change a Bill from open to paid?
- What is the Difference Between an Expense and a Bill?
- How can I see if any Bills are past their due dates?
- How do I review the payment history for a Bill?
- How do I change specific field names when I generate the Bill in PDF format?
- How do I generate a PDF of the Bill and email to employee?
- How do I import Expenses into a Bill?
- How do I generate a Bill from a Purchase Order or Subcontract?
- How do I markup a Bill and generate an Invoice directly to my Customer?
- How do I post a payment to a Bill?
- How do I make sure a Bill is accurately job costed?
- How Do I Create a New Bill?
- How do I pay full or partial retention on a Sub Contract?
- How do I generate a Bill from the Subcontracts Module?
- When to use Expense or Bills? How does this impact job costing?
- How do I generate a Bill or Sub-Contract from a Bid?
- What is the difference between the Billing rate and the Burden rate in Employee Timecard reporting?
- Show all articles ( 5 ) Collapse Articles
-
Calendar
- ☞Video: Calendar
- How to sync the Contractor Foreman Calendar with Outlook or Google?
- Which items can appear on the calendar?
- How do I add an event in Calendar from the Dashboard?
- How do I see what Events are assigned to each Employee?
- How can I add a Marketing activity to my Calendar?
- How do I create an Event on my Calendar?
- How can I display my Crew Schedule on the Monthly view of the Calendar?
- What is the difference between the Private and Shared setting in the Calendar.
- How Do I See All the Assignments for the Users on the Calendar?
-
Change Orders
- ☞Video: Change Orders
- Basics of Change Orders
- How can I adjust a change order amount?
- How do I generate a Change Order for a Subcontractor?
- How do I submit a Change Order for Approval?
- How do I verify the Change Order value is accounted for in the financials of the Project?
- How do I keep the Change Order amount from affecting the overall Contract Value of the Project?
- How do I add Markups to items in a Change Order?
- How do I add Tax to a Change Order?
- How do I cross reference to an RFI in Change Order Request?
- How do I change the status of a Change Order from Hold to Billed?
- Why do we have an option to import items from an Estimate into a Change Order?
- How do I make a Change Order reflect a negative value?
- How do I convert a Change Order Request to a Change Order?
- Is there an option to sign the Change Order within the mobile app?
- How do I generate an Invoice from Change Order?
- How do I edit Templates for Invoices?
- Using Change Order Templates
- Change Order Enchancements
- Show all articles ( 4 ) Collapse Articles
-
Client Portal
- Is the Gantt view available for my client?
- Can my client pay their invoice online?
- Client Access
- Can my clients designer or architect have access to the client portal?
- Does the client have to create an account or is it created for them?
- ☞Video: Client Portal
- ☞Video: Client Access Configuration
- ☞Video: Client Access View
-
Contractor Foreman & QuickBooks
- Are Bills synced with QuickBooks?
- Do I create Bills in Contractor Foreman or QuickBooks?
- How an Estimate Transfers from Contractor Foreman to QuickBooks
- How an Estimate Transfers from QuickBooks to Contractor Foreman
- How Contacts Sync Between Contractor Foreman and QuickBooks
- How do Bills Sync from Contractor Foreman to QuickBooks
- How do Bills sync from QuickBooks to Contractor Foreman
- How Do Expenses Transfer from Contractor Foreman to QuickBooks?
- How Do Invoice Payments Transfer from Contractor Foreman to QuickBooks?
- How Do Invoice Payments Transfer from QuickBooks to Contractor Foreman?
- How Do Invoices Transfer from Contractor Foreman to QuickBooks?
- How Do Invoices Transfer from QuickBooks to Contractor Foreman?
- How do Time Cards transfer to QuickBooks from Contractor Foreman
- How Projects Sync Between Contractor Foreman and QuickBooks
- How Purchase Orders Transfer Between Contractor Foreman and QuickBooks
- Posting a Payment to a Bill in Contractor Foreman and QuickBooks
- Recommended Workflow to Work with Contractor Foreman and QuickBooks
- Contractor Foreman & QuickBooks Integration: What Syncs and What Doesn't
- When do I use Bills vs Expenses to record project related expenses?
- Timecards & Payroll Best Practices
- How Sales Taxes calculated on Bills will Work in Contractor Foreman (Reporting Purposes Only)
- Show all articles ( 6 ) Collapse Articles
-
Cost Codes
- ☞Video: Cost Items vs Cost Codes
- Adding or Revising Cost Codes
- Import Cost Codes
- What is the purpose of cost codes and how to use cost codes?
- How do I add Cost Codes to Contractor Foreman from my QuickBooks file?
- How do I delete a Cost Code I no longer use?
- What is the purpose of a Retainage Code and how does this integrate with QuickBooks?
- How do I avoid duplicate Cost Codes when I import a new CSV file?
- How can I restrict the cost codes that are displayed when using the Timecard feature?
- What are cost codes and how to create them?
-
Cost Items Database
- ☞Video: Cost Items Database
- ☞Video: Cost Items vs Cost Codes
- Basics of Cost Items Database
- How do I use the Hidden Markup in the Cost Items Database?
- What is the purpose of Variations in the Cost Items Database record?
- How do I add or change markups to multiple line items in the Cost Items Database?
- How do I create an Item Group and use it from the Cost Items Database?
- How do I import Cost Items into the Database using a CSV file?
- How do I see which items have Detailed Descriptions in my Cost Items Database?
- Basics of Schedule of Values (SOV)
- Bulk Edit Markups in the Cost Items Database
- Updates to the Cost Item Database (CIDB)
- Purchase Orders – SKU Field Now Automatically Carries Over
-
Crew Schedule
- ☞Video: Crew Schedule
- How can I reduce the amount of projets that appear in the list?
- How do I notify my crew about their work schedule?
- How do I create or edit a crew?
- Can I schedule multiple people at one time?
- How do we change the company work hours and work days?
- Can I show my project schedule (Gantt items) on my Crew Schedule?
- How can I mark out someone who will be out of work?
- When should the New Shift button be used?
- How do I add a Crew for use with the Crew Schedule or Timecards?
- ☞Video: Crew Schedule Mobile App
-
Daily Logs
- ☞Video: Daily Logs
- Adding a New Daily Log
- How can I put photos in daily logs?
- How to add employees to a Daily Log?
- How to create daily log record from Time card?
- What Types of Logs Can We Track Using Daily Logs?
- How do I track the materials received at the site and reconcile the quantities with the appropriate Purchase Order?
- What is the benefit of cross referencing incident / accident logs to Daily Logs?
- How do I add a note to a Daily Log created on a previous date?
- How do I add an Incident in a Daily Log?
- How do I add Material Items and Equipment Items to Daily Logs?
- How do I see Time Card hours in the Daily Log?
- How do I update the Daily Log status ?
- ☞Video: Daily Logs Mobile App
- Attachments vs Associated Files: What is the difference?
-
Directory & Contacts
- Video: Directory
- What is the Directory and How to Use It
- Exporting Contacts from QuickBooks
- How do I Save my Excel File as a CSV?
- How to delete a contact?
- How to Convert a Lead to a Customer?
- How to import contacts to Contractor Foreman
- Adding Users (Licenses)
- Disabling an Employees or User's Account
- How are Tags and Scope of Work fields used in Contractor Foreman?
- How do I add Additional Contacts to a Directory record?
- How do I create an Estimate from the Lead record?
- How do I link a Contractor to a Bid Package?
- How is the Access/Gate Code from the Customer record used and can it be restricted to certain individuals?
- How do I assign or restrict Project access for Employees and Subcontractors?
- How do I setup a new User and send email with Login credentials?
- An email I sent was not received or bounced.
- Updated Roles and Permissions
- Feature Update: Special Characters Now Supported in Directory Contact Names
- Certificates & Expiring Certificate Reminders
- Setting Reminders for Expiring Certificates or Licenses
- Setting the Sort Method for Contacts (Per User)
- Show all articles ( 7 ) Collapse Articles
-
Document Writer
- ☞Video: Using the Document Writer
- What is the purpose of the Document Writer?
- Are there templates that I can use for Document Writer?
- How do I create or edit a document in the Document Writer?
- The formatting of my document is not correct
- Can I use the Document Writer as a means to get signatures, like a contract?
- How do I resend or download a generated/sent document?
- How do we create an Estimate proposal package?
- How do we create a lien waiver (or other agreement/contract)?
- ☞Video: Creating Proposals using Canva (and others)
- How do I create or edit a document in the Document Writer?
-
Equipment Logs
-
Estimates
- How to create an Estimate and add Estimate Items?
- How to add a tax percentage to bids so it can automatically give the total with tax?
- How to create an estimate template and how to use an estimate template?
- Is it possible to create an estimate without a Project tied to it?
- What is the purpose of Optional Items and how to create one?
- How do I add information to a Bid Item to provide more details and clarification to the Bidder regarding that specific item?
- What is the purpose of the $0 item?
- How do I use the "variation" field within the Cost Items Database and Estimate?
- How do I add or modify the Project Type on the details page of the Estimate?
- How do I archive an Estimate?
- How do I assign the Vendor or Contractor to a specific line item in the Estimate?
- How do I award a bid received via the Bid Package?
- How do I copy a Section and its items to add a new Section?
- How do I create a new Bid Package for any trade and assign Bidders?
- How do I create a default Scope of Work for an Estimate?
- How do I easily display any Estimate line items that have a $0 value?
- How do I export the Estimate Items to a CSV file?
- How do I import a CSV file of items into an Estimate?
- Understanding and Editing the Cover Sheet of an Estimate?
- How do I add or modify the default Estimate status values to represent our workflow?
- How to rearrange the sections and items in a section?
- How do I rearrange the sequence of Sections and Estimate line items using drag and drop?
- How do I search for a previous Estimate?
- How do I send a Bid Notification or Request to bid from the Estimate?
- How do I send a proposal so that the customer sees the final total amount and not the complete estimate breakdown?
- How do I share files attached to the Estimate with the Customer or Lead?
- How do I submit an Estimate for approval?
- How do I update an Estimate if its status is not set to Bidding?
- How do I courtesy copy other contacts when I submit the Estimate for approval via email?
- How do I track Bidding emails and quotes from the various Vendors or Subcontractors?
- What is the difference between Selections, Options, Allowances and Variations?
- Basics of Schedule of Values (SOV)
- Markup vs Margin: What is the Difference?
- ☞Video: Estimates
- Local Material and Labor Costs Database from 1build
- How are allowances set?
- Timeline Feature in Contractor Foreman
- Estimate Reports – New Estimator Field & Improved Readability
- How Do I Change Status Labels and Their Colors in the Card View of Certain Features?
- How to Subtract Areas in Kamai for Accurate Construction Estimates
- Show all articles ( 25 ) Collapse Articles
-
Expenses
-
Files and Photos
- ☞Video: Files & Photos
- How do I create the default folders for a specific Project?
- How do I add files to folders in the Files & Photos feature?
- How do I export a single file or multiple files in the Files & Photos feature?
- How do I move files from one folder to another within Files & Photos?
- How do I delete a file in the Files & Photos feature?
- How do I search for a file within a specific Project?
- How do I share a file with a client or vendor?
- Basics of Files & Photos
- How do I add files to a Project?
- How to connect Contractor Foreman to CompanyCam.
- Attachments vs Associated Files: What is the difference?
- ☞Video: Adding Annotations to Files/Photos
- File and Photo Upload Limits
- Working with PDF Markups and Measurements
- How do I export a single file or multiple files in the Files & Photos feature?
- How do I add files to folders in the Files & Photos feature?
- How do I add files to folders in the Files & Photos feature?
- How do I export a single file or multiple files in the Files & Photos feature?
- How do I move files from one folder to another within Files & Photos?
- How do I delete a file in the Files & Photos feature?
- How do I search for a file within a specific Project?
- Basics of Files & Photos
- Dropbox Integration in Contractor Foreman: Sync Behavior and File Management
- Show all articles ( 9 ) Collapse Articles
-
Forms & Checklists
- ☞Video: Forms (Basic Builder Part 1)
- ☞Video: Forms & Checklists (Advanced Part 1)
- ☞Video: Forms & Checklists (Advanced Part 2)
- How to Edit/Customize Forms?
- How do I create a form using the Basic form builder? Using the Advanced form builder?
- How to Delete Forms?
- How do I designate a Form to be a favorite?
- What are Forms and Checklists and an Overview of the Module
- ☞Video: Forms (Basic Builder Part 2)
- ☞Video: Forms & Checklists Mobile App
- Forms and Checklists: Usability Enhancements
-
Getting Started
- ☞Video: Getting Started
- Adding Users (Licenses)
- Disabling an Employees or User's Account
- Exporting Contacts from QuickBooks
- Having trouble finding an item entered previously?
- How do I report a bug?
- How do I setup what should show on the App Menu?
- How to Un-Archive an Item?
- How to use the "Quick Start" Method for Contractor Foreman
- Modifying / Editing and Saving Records
- Zapier Integration
- Basics of Company Settings
- How to use the feature Access/Gate Code?
- What should be the first step while starting work with Contractor Foreman?
- How do I add Custom Fields to add certain Features?
- What is the purpose of Custom Fields?
- How do I add an Inspection record and associate it to Permits?
- How do I add my address and other details or letterhead on the top of the PDF?
- Why to add multiple inspections for single project?
- How do I see my most recent activities and notifications?
- What is a good process to get up and running in Contractor Foreman quickly?
- How do I track Permits for a Project?
- How do I increase the size of my Logo?
- How do I access the Tutorials available to understand the software?
- What is the quickest way to add a Calendar entry, Sales activity or To-Do?
- When should I book my first training session?
- How do I edit the Templates for estimate, invoices etc?
- How do I remove the Sample Data that is initially installed with the software?
- How do I replace the Contractor Foreman logo with my company logo?
- How do I request time off?
- How do I schedule a Private Training?
- How do I view Archived Items?
- When should I use Chat vs booking a Training session?
- What are Roles and how to create and edit Roles?
- Assigned Projects & Default Project
- How to See Employee Login Activity in Contractor Foreman
- Understanding Team Chat in Contractor Foreman
- Show all articles ( 22 ) Collapse Articles
-
Incidents
- ☞Video: Incidents
- Adding a Employee Write Up
- Adding a New Incident
- Basics of Employee Write-Up's
- Basics of Incidents
- How do I link or reference the Incident data to an Employee Write-up record?
- What is the OSHA 300 log for an employee?
- How do I create an OSHA report for any employee for any event that occurred?
- How do I make a copy of all the Incidents and Employee Write-ups for my HR files?
-
Inspections
- ☞Video: Inspections
- Adding a New Inspection
- Using the Inspection Module
- How to Create an Inspection?
- How do I cross reference a Permit to the Inspection record?
- How do I assign the Status Color for my Inspections?
- How do I copy an Inspection?
- How to Assign Status Colors for Inspections
- Why to add inspection in Permit Details, what is the purpose to add it?
- Inspections Module Update
-
Integrations
-
Invoicing
- ☞Video: Invoices
- Adding a New Invoice
- Can you make an invoice without any project?
- How can I add Tax to my invoice?
- Can a customer or vendor credit be added?
- How do I reduce the retainage deduction after having reached a certain contractual milestone for Invoicing?
- What is the difference between using the % or the $ markup toggle feature?
- How do I create Progress Billing Invoices?
- What is the purpose of a T&M invoice?
- How do I create a G702/G703 AIA Invoice?
- How do I generate an Invoice from a Service Ticket?
- How do I force my Markup to be a specific $ amount instead of a percentage calculation?
- How do I post a Payment to an Invoice?
- How do I track Retainage on an Invoice?
- How do I Un-Archive or reactivate an Invoice?
- How do I designate whether Progress Invoicing for a Project is based on % complete or unit quantity? And how to enable Over Billing?
- Is it relevant to raise invoices that are free from any specific project?
- How do I generate an Invoice that is not associated with a Project?
- How do I delete tax rates, so I can recreate proper ones?
- How do I setup and add a VAT Reverse Charge (reverse tax)?
- How do I edit Templates for Invoices?
- How is Retention (Retainage) held and released?
- Progress Invoicing: How Contractor Foreman Handles Rounding Decimals
- Show all articles ( 8 ) Collapse Articles
-
Leads
- ☞Video: Leads
- How do I add a new Lead Source?
- How do I track calls and meetings with a lead?
- Can I add a lead capture form to my website?
- How do I sync leads from my Angi Leads and HomeAdvisor account?
- Can I send Leads to my CRM or email system using Zapier?
- If a Lead becomes a customer, does the data transfer to the customer record?
- What is the difference between the Leads in the Directory and the Leads module?
- What is the difference between a Lead and an Opportunity?
-
Notes
-
Opportunities
- ☞Video: Opportunities
- How do I create an Estimate and link it to the Opportunity record?
- When does it make sense to use the Opportunity record?
- What is the difference between a Lead and an Opportunity?
- What happens to the associated estimates of the opportunity once it gets converted?
- Why would a customer want to convert an Opportunity to a Project?
- How do I notify or assign an Opportunity to an Employee for follow-up?
- How do I convert an opportunity into a Project?
- How to get all Opportunity line items to Estimate and SOV?
- How to set Opportunity each stage of a custom theme for general view list of records?
- Can I keep the opportunity details after creating an estimate?
-
Payments
-
Permits
-
Projects
- ☞Video: Managing Projects
- ☞Video: Job Costing with Contractor Foreman
- Adding a Project
- How can a Project be removed from the list view after being Completed?
- How do I add files to a Project?
- Basics of Schedule of Values (SOV)
- How to view the schedule status of a Project?
- How do I enable a Project to accept Time Cards?
- How to manage a project created with a Work Order?
- Can Client Access be enabled from directory rather than project?
- How are the Committed or Actual Labor costs generated on the Financial Tab for the Project?
- What is the difference between Committed Cost and Actual Cost?
- How do I enable the Client Portal? Can I restrict the access to financial details?
- How do I create Invoices for my Work Orders from the Schedule of Values tab?
- How do I create Invoices for my Change Orders from the Schedule of Values tab?
- Can I restrict the access to financial details?
- How do I change the Logo on the Client Portal?
- How do I build the set of default File Folders for saving my Project information?
- How do I change and track the Status of my Projects? Can I modify the default Project Statuses that are provided?
- How do I estimate my current Gross Profit from the Financial tab in the Project?
- Can the project status be changed automatically? (from pending to completed)
- How do I receive a notification that my Project has gone over Budget?
- How do I show Labor Costs in the Project and how Cost Codes are important to be used in Timecards?
- How do I activate the geofence fence area for the Project? Is there a recommended radius for the GEO fence feature?
- How do I add companies and contacts to my Project Contact tab?
- How do I assign a Project Manager to a Project?
- How do I generate a Budget vs Actual report for a lump sum project?
- How do I know what files I have shared with my client?
- How do I limit or restrict Project Access to some Employees?
- How do I remove a Project from being displayed after being Completed but still keep all the details for historical reference?
- How do I restrict the Internal Notes entered on the Project screen from being seen by other Users?
- How do I select which Projects I want to show up on my Schedule?
- How do I set the Project IDs to be created automatically?
- How do I track costs against a Change Order in addition to the Original Contract or Estimate?
- Where can I track all the payments done by me for any particular project?
- How do I enable the Procurement tab for my Project?
- How do I modify the Project folder tree in the Project files tab?
- How to add a New Note & Link it to a Project?
- Assigned Projects & Default Project
- Attachments vs Associated Files: What is the difference?
- Understanding the Work In Progress (WIP) Report
- ☞Video: Schedule of Values
- An Overview of the Financial Tab of Projects
- Assigned Projects & Default Project
- Understanding the Workflow of Contractor Foreman
- Show all articles ( 30 ) Collapse Articles
-
Punchlists
- ☞Video: Punchlists
- Adding a New Punchlist
- Basics of Punchlists
- How do I print a Punchlist?
- How to add items to a Punchlist?
- Modifying or Editing a Punchlist Line Item
- How do I designate which items are completed on the Punch List?
- How do I add items to the Punch List after it has been created?
- How do I print a Punch List?
-
Purchase Orders
- ☞Video: Purchase Orders
- How to Create a New Purchase Order?
- How do you change the ship to address on a purchase order?
- Why should I import my Estimate items into a Purchase Order?
- How is Reference & FOB point used in producing a Purchase Order?
- How do I add a Discount on a Purchase Order?
- How do I change the ship to address on the purchase orders?
- How do I change the terminology on the PDF that is created by using a Template?
- How do I generate a Bill from the Purchase Orders Module?
- How do I manually add items to a Purchase Order?
- Viewing Bill History on a Purchase Order
- Using the Custom Tab for Purchase Orders
- Creating a Pricing Request (Instead of a Standard PO)
-
QuickBooks
- Add a Discount Line Item on Invoices
- Are Bills synced with QuickBooks?
- Create a Retainage Account
- How do I calculate Payroll?
- Set Default Income/Expense Account
- What Syncs with QuickBooks
- How do I compare and match the entries I have in Contractor Foreman and QuickBooks?
- How do I know when an item has successfully synced and moved over to QuickBooks?
- How do I verify that the QuickBooks sync has been complete without any errors?
- How Do I Integrate with QuickBooks?
- Migrate from QuickBooks (Desktop version) to QuickBooks (Online version)
- How do I disconnect from QuickBooks?
- How do I choose what syncs with QuickBooks?
- Important Update: QuickBooks Desktop Support Ends January 1, 2026
- QuickBooks Users: Auto-Logout
- Creating Projects from QuickBooks to Contractor Foreman (One-Way Sync)
- Show all articles ( 1 ) Collapse Articles
-
Reports
- ☞Video: Reports
- ☞Video: Job Costing with Contractor Foreman
- Basics of Reports
- How is Labor Calculated
- How do I access Custom Fields through reports for any particular Feature?
- How do I generate a weekly time card report for an individual employee?
- How do I view a report without actually downloading it?
- How do I set the default format of report to PDF?
- How to generate any custom report?
- How do I generate a report to see the Estimated and Actual cost?
- How do I see an employee's total hours and activity for a specific project?
- How do I generate a Total Billings Report with $ amounts?
- Job Costing Calculations Explained
- How do I export time cards into a decimal format?
- How do transactions impact job costing reports?
- Understanding the Work In Progress (WIP) Report
- What is the difference between committed costs and actual costs?
- Markup vs Margin: What is the Difference?
- Webinar - "Finding Your Answers in Contractor Foreman Reports"
- Master Project Management Reports in Contractor Foreman
- Contract Minus Costs
- Show all articles ( 6 ) Collapse Articles
-
RFI & Notices
- ☞Video: RFI & Notices
- Adding a Compliance Notice
- Adding New RFI (Request for Information)
- Basics of Correspondence
- Correspondence Overview
- Adding a Schedule Notice
- What is the purpose of a Compliance Notice?
- What is the purpose of a Schedule Notice?
- What is the purpose of a Request for Information?
- Why do we cross reference a Change Order in the RFI record?
- Compliance Notice vs Schedule Notice
- Why Do We Cross-Reference a Change Order in the RFI Record?
- Compliance Notice vs Schedule Notice
-
Safety Meetings
- ☞Video: Safety Meetings
- Basics of Safety Meetings
- How to Create a New Safety Meeting?
- How do I add new safety topic and content for my Safety Meetings?
- How do I attach a file/image to a Safety Meeting?
- How do I document the signatures of the attendees to a Safety Meeting?
- How do I restrict an attendee's access to a safety meeting to providing his Signature Only?
- How do I add a video link for any safety new topic?
- Using Safety Topics and Safety Meetings in Contractor Foreman
- Safety Meetings – Module Improvements
-
Schedule
- ☞Video: Scheduling
- How to get my Projects to show on schedules?
- What is a Baseline schedule and how is it used?
- What is the purpose of Milestones?
- How do I add and modify the tasks in the Schedule?
- How do I make Schedule tasks visible to the Schedule tab within the Project?
- How do I link tasks across multiple projects so if a task is delayed in one project it will trigger a delay in another project?
- How do I document task completion on the Schedule?
- How do I create a Schedule from the line items in my Estimate?
- How do I select which Projects I want to see simultaneously in the Schedule feature?
- How do I create a Gantt chart for any project and track that project?
- What is the purpose of the Assigned Contractor and Employee field in the Schedule Task?
- How do I select which Projects I want to show up on my Schedule?
- Schedule Module Update: Improved Performance and Usability
- Schedule Dependencies
-
Schedule of Values
- ☞Video: Schedule of Values
- Basics of Schedule of Values (SOV)
- If I don't Import the line items from Estimate and I add them manually, how does this affect the calculations in the Financial tab of the Project?
- How do I add the Change Order costs and marked up values to the Schedule of Values?
- Is it required to add or import the Schedule of Value from the Approved Estimate?
- How do I generate an Invoice from the Schedule of Values?
-
Service Tickets
- ☞Video: Service Tickets
- Basics of Service Tickets
- Why can I not show all open service tickets on one screen?
- What is Dispatch: Map & Calendar used for?
- Does a Service Ticket have to be associated and linked to a Project?
- How are the Service Tickets linked to the Timecard feature?
- What is the purpose of Duration field in the Service Ticket?
- How do I archive Service Tickets?
- How do I invoice the Customer for Service Tickets?
- How do I post a payment for any service ticket?
- How do I see a list or display of all of my open Service tickets?
- How do I set the Priority Status for the Service Ticket and can I filter and display a list based on these Priorities?
- How do I update the Service Ticket status?
- How do I track the hours spent on a specific Service Ticket?
- How to Collect Client Signatures Using Service Tickets
- Collecting Customer Signatures on Service Tickets
- Show all articles ( 1 ) Collapse Articles
-
Settings
- ☞Video: Settings
- ☞Video: Cost Items vs Cost Codes
- Cleaning Text for Copy and Paste (Fixes Blank PDF)
- Location Permission Settings in Android
- Settings and their Descriptions
- How do I set a reminder for any Expiring Certificates or Licenses that I am tracking?
- How do I set the Sort Method for Contacts for a specific User account?
- Can I add new fields to any of the default Templates?
- How are Roles used and how are they connected to the Directory?
- What is the difference between the Billing rate and the Burden rate in Employee Timecard reporting?
- How do I delete my Company Logo from the top of specific Templates?
- How do I remove Contractor Foreman logo from the PDF's?
- How many users can be created via one Contractor Foreman subscription?
- How User Number being counted?
- How do I add a Crew for use with the Crew Schedule or Timecards?
- How do I add and use Tags?
- How do I add and modify Custom entries for each of the pulldown features?
- How do I add or modify the Custom Fields for each Feature?
- How do I add or modify the PDF templates for each of the Features?
- How do I add Taxes and Tax Rates to my account?
- How do I add Time Off Requests under the User Settings?
- How do I add Training & Certifications under the User Setting?
- How do I assign a color to a User?
- How do I change my Password?
- How do I change Status labels and their colors in the card view of certain Features?
- How do I change the color theme for the Templates?
- How do I create a new User?
- How do I see all the assignments for the Users on the Calendar?
- How do I set or edit my email signature?
- How can I import cost codes from Excel into Contractor Foreman?
- How to remove a Custom Field from being used within a Feature?
- How do I remove Sample Data?
- How do I replace my Company Logo with a new one?
- How do I restrict the ability to DELETE records to certain individuals within my company?
- How do I set the initial Numbering for each of the Features?
- How do I setup what features should be displayed and in what order on the App Menu for my mobile device?
- Managing how I receive notifications
- How do I sync my personal Calendar with Contractor Foreman?
- Account Details & Upgrade or Cancel
- What are Roles and how to create and edit Roles?
- Assigned Projects & Default Project
- Basic of User Settings
- What is the maximum file size for each upload?
- How do I add my address and other details or letterhead on the top of the PDF?
- Stripe Online Payment FAQ's and How To's
- How do I setup a new User and send email with Login credentials?
- How to Downgrade Your Plan in Contractor Foreman
- Settings and Their Descriptions
- Adding New Fields to Default Templates
- How are Roles used and how are they connected to the Directory?
- How do I delete my Company Logo from the top of specific Templates?
- How do I remove Contractor Foreman logo from the PDF's?
- How do I add and use Tags?
- How can I import cost codes from Excel into Contractor Foreman?
- How do I remove Sample Data?
- How do I replace my Company Logo with a new one?
- ow do I set the initial Numbering for each of the Features?
- How do I setup what features should be displayed and in what order on the App Menu for my mobile device?
- Managing how I receive notifications
- How do I sync my personal Calendar with Contractor Foreman?
- What are Roles and how to create and edit Roles?
- What is the maximum file size for each upload?
- How do I add my address and other details or letterhead on the top of the PDF?
- How Is User Number Being Counted?
- How Many Users Can Be Created via One Contractor Foreman Subscription?
- How Do I Setup a New User and Send Email with Login Credentials?
- How Do I Set or Edit My Email Signature?
- How Do I Create a New User?
- How Do I Change the Color Theme for the Templates?
- How Do I Change My Password?
- How Do I Add Time Off Requests under the User Settings?
- How Do I Add Taxes and Tax Rates to My Account?
- How Do I Add or Modify the PDF Templates for Each of the Features?
- Cleaning Text for Copy and Paste (Fixes Blank PDF)
- Account Details & Upgrade or Cancel
- Bulk Action Toolbar in Estimates
- Creating Bid Packages from the Bulk Action Toolbar
- Manual Entry of Bid Submissions
- Bid Package Organization and Structure Enhancements
- Estimate Presentation and Editing Improvements
- Estimates Workflow Visibility and Follow-Up Enhancements
- Estimates Navigation, Filtering, and Data Management Improvements
- Does Changing a User's Language Affect Other Users?
- User Language Preferences
- Show all articles ( 69 ) Collapse Articles
-
Sub-Contracts
- ☞Video: Sub-Contracts
- Basics of Sub-Contracts
- What are the benefits of Sub-Contracts?
- How do I enter a Bill from a Subcontractor for partial completion of their Scope of Work?
- How do I designate that Retainage is supposed to be held on a Sub-Contract?
- What are the benefits of using a Sub-Contract instead of a Purchase Order?
- How does a Subcontractor approve a proposed Sub-Contract? Do they need to be a User of the software?
- What is the purpose of "Share Link" in the Action dropdown?
- How do I track work performed for a 1099 Subcontractor?
- How do I generate a Bill from the Subcontracts Module?
- How do I pay full or partial retention on a Sub Contract?
-
Submittals
- ☞Video: Submittals
- Basics of Submittals
- Attaching Items to a Submittal
- Tracking Submittals in Contractor Foreman
- How do I attach files to the Submittal Items?
- Creating a Copy of an Existing Submittal
- Emailing a Submittal with Attached Files Displayed in the PDF
- Submittal Approvals in Contractor Foreman
- Submittals Settings, Revisions & Tips for Better Organization
-
Takeoff
- Editing Existing Takeoffs
- Manual Takeoff Tools Explained
- Reviewing & Calibrating Drawing Scale
- Search Element Function & Exporting to the Contractor Foreman Estimates Module
- Takeoff Tool Interface Overview
- Understanding Automatic Takeoffs & Reviewing Auto-Generated Takeoffs
- Uploading Drawings into the Takeoff Tool
- Using the Legend Panel, Managing Folders & Subfolders, and Using Chat & Prompts
- ☞Video: Takeoffs
- Exporting a Marked-Up Plan from the Takeoff Tool in Contractor Foreman
- How do I generate a takeoff for items not shown in the drawings?
-
Time Cards
- Time Cards
- How can I activate GPS location for time cards?
- How do I calculate Payroll?
- How is Labor Calculated
- How to bypass the time clock feature and just enter total hours?
- What is 'Running Time Card' Notification?
- I have entered the weekly sheet for my employees accidentally. Can I delete it? If not how to adjust that cost in my contract amount?
- If I clock into an Employee Time Card, why is the Crew Card automatically disabled?
- How is overtime is calculated?
- How do I use Tags in Timecards?
- How do I set up a notification if I exceed budgeted hours on a Project?
- How do I enable the Timecard feature for a Project?
- How do I activate GPS tracking for Timecards?
- How do I add a Break manually to a Timecard?
- How do I set up automatic breaks to be applied in time cards?
- How do I track my Labor Costs against my Estimated Labor Costs?
- How does the Verify Time Card feature work?
- My labor amounts are wrong based on hours worked.
- How do I export time cards into a decimal format?
- ☞Video: Time Cards
- How do I activate the geofence fence area for the Project? Is there a recommended radius for the GEO fence feature?
- Prevailing Wage, how to use different Labor Rates for different Projects?
- ☞Video: Mobile App - General Training
- How to Track Salaried Employees for Job Costing Using Time Cards and Cost Codes
- ☞Video: Time Cards Mobile App 2
- Employee Clocking Out Questions – Update
- New Feature: Make Cost Codes Mandatory on Time Cards
- How do I enable Offline Time Cards?
- How to Enable Offline Time Cards
- Enable Offline Time Cards
- Show all articles ( 15 ) Collapse Articles
-
To-Do's
- ☞Video: To-Do's
- Basics of To-Do's
- To Do's Privacy
- How do I make the To-Do's show up on my Dashboard?
- How to check off To-Do's list items?
- To-Do's Notifications
- How do I create a To-Do's list if I am at my Dashboard?
- How do I see all To-Do's on the Calendar?
- How do I use a To-Do template to create a new To-Do? Can I use multiple To-Do templates to create a single To-Do?
- ☞Video: To-Do's Mobile App
-
Vehicle Logs
-
Webinars
- Lead with Confidence: Elevate Your Contracting Business
- Master Project Management Reports in Contractor Foreman
- Webinar - "Finding Your Answers in Contractor Foreman Reports"
- Cost Code Setup and QuickBooks Integration
- 2026, Jan 16th - Daily Production Tracking: Seeing Problems While There’s Still Time to Fix Them
- 2026, Jan 23rd - MEP Coordination and Trade Sequencing
- 2026, Jan 30th - Lean Six Sigma – Reducing Process Variation
- 2026, Feb 13th - Scope, Change, and Cost Control: Keeping Jobs Aligned as Conditions Shift
- 2026, Feb 20th - Production Control in the Field: Turning Daily Activity into Progress
- 2026, Feb 27th - Verifying Work Before It Becomes Rework
- 2026, March 6th - From Estimate to Execution - Budget Communication & Cost Code Strategy
- 2026, March 13th - Cost Code Discipline & Time Card Accuracy
- 2026, March 20th - QuickBooks and Contractor Foreman Workflow Best Practices — Avoiding Sync Issues in Contractor Foreman
- 2026, March 27th - Daily Logs Done Right
- 2026, April 3rd - Cost Codes Made Simple
- 2026, April 10th - Move From Plans to Quantities
- 2026, April 17th - Cash Flow Basics: invoicing and Getting Paid
- 2026, April 24th - Tracking Project Costs
- 2026, May 1st - Subcontractor Cost Control
- 2026, May 8th - Save Hours Per Day: Daily Logs & Scheduling
- 2026, May 15th - From Plans to Project
- 2026, May 22nd - Document It Before It Becomes a Problem
- 2026, May 29th - Sales and CRM
- 2026, June 5th - From Field Issue To Approved Scope
- 2026, June 12th - Cost Plus Workflow
- 2026, June 19th - From Plans to Project: AI Takeoffs to Estimates
- 2026, June 26th - Cost Codes Made Simple
- 2026, July 3rd - Time and Material Workflow
- 2026, July 10th - Takeoffs From Drawings to Usable Quantities
- 2026, July 17th - What's New July Updates
- 2026, July 24th - Build a Better Project Schedule in Contractor Foreman
- 2026, July 31st - Job Cost Tracking Done Right
- 2026, August 7th - Faster, Smarter Takeoffs Inside Contractor Foreman
- 2026, August 14th - Know Your Numbers - Understanding the Project Financials
- 2026, August 21st - Contractor Foreman and QuickBooks
- 2026, August 28th - Inspections in Contractor Foreman
- Show all articles ( 21 ) Collapse Articles
-
Work Orders
- ☞Video: Work Orders
- Understanding and Creating Work Orders in Contractor Foreman
- How can I upload files to a work order?
- How do I archive a work order?
- How do I add or modify line items and quantities to a Work Order if it has already been Approved?
- How can I use a Work Order as a project
- How do I import Work Order items into a Change Order Request or Change Order?
- What is the purpose of the Type and Drawing fields in the Work Order?
- How do I enter Terms & Conditions for a Work Order and why is this beneficial?
- How do I generate an Invoice from a Work Order?
- How do I import specific estimate items into a Work Order?
It’s important to understand that payments cannot be posted directly to a Service Ticket in Contractor Foreman. This functionality is intentionally not supported to maintain proper financial tracking and ensure all revenue is tied to invoices.
How to Properly Post a Payment for a Service Ticket
Since direct payments to Service Tickets are not possible, the correct workflow is as follows:
-
Create an Invoice from the Service Ticket
-
Open the Service Ticket.
-
Use the “Create Invoice” option to generate an invoice for the services provided.
-
-
Post the Payment Against the Invoice
-
Once the customer’s payment has been received and confirmed, post it against the invoice that was generated for the Service Ticket.
-
This ensures the payment is properly tracked in both your financial records and reporting.
-
Why This Workflow Matters
-
Keeps financial transactions organized and tied to invoices.
-
Ensures accurate reporting and accounting.
-
Creates a clear paper trail between service performed, invoice issued, and payment received.
0 out of 5 stars
| 5 Stars | 0% | |
| 4 Stars | 0% | |
| 3 Stars | 0% | |
| 2 Stars | 0% | |
| 1 Stars | 0% |